• Wednesday, 25th November 2026

Train Cancellations and Diversions on Tirupati Route Until December 27: Check Travel Updates



Railway infrastructure works disrupt train services

Train operations on the Gudur–Renigunta–Tirupati section are being affected by infrastructure development works at Renigunta railway station in Andhra Pradesh.

The work involves yard remodelling and commissioning of an Electronic Interlocking (EI) signalling system under the Guntakal Division of South Coast Railway. The scheduled work period runs from November 10 to December 27, 2026.

According to reports, a total of 109 train services are affected, with 73 trains diverted and 36 cancelled during the 48-day period.

 


Three phases of railway work

The infrastructure work is being carried out in three phases. Pre-Non-Interlocking works are scheduled from November 10 to December 9. The next phase, involving block hours, is planned from December 10 to 19. The final Non-Interlocking phase is scheduled from December 20 to 27.

These changes are intended to facilitate the remodelling of the railway yard and installation of the new signalling system.

Passengers may face changes in routes and timings

Several express, MEMU and special trains are affected by the operational changes. Some long-distance services are being diverted through alternative routes, including Arakkonam, Perambur and Gudur, while selected trains may skip their usual stoppages.

Certain services are also being rescheduled, with reported delays ranging from 45 to 180 minutes.

The Nandyal–Renigunta services (77211/77212) are also affected, with trains scheduled to originate and terminate at Nallapadu instead of Renigunta during the work period.

Passengers advised to check train status

The changes may particularly affect pilgrims travelling to Tirupati and Tirumala, as well as passengers using the Gudur–Renigunta route.

Passengers are advised to verify their train's running status, route, stoppages and departure time through official railway channels before travelling.

The railway authorities have stated that measures are being taken to minimise inconvenience while the infrastructure works are underway.


₹4,299-Crore Railway Line Project: Tenders Floated for Bikkavolu–Duvvada Third and Fourth Lines Read Previous

₹4,299-Crore Railway Line Project: Tenders Floated for Bikkavolu–Duvvada Third and Fourth Lines

Sign up for the Newsletter

Join our newsletter and get updates in your inbox. We won’t spam you and we respect your privacy.