• Tuesday, 04th March 2025

Select Trains on Kothavalasa-Kirandul Line to Be Short-Terminated at Dantewada for Safety Enhancements



To facilitate essential safety works, certain trains operating on the Kothavalasa-Kirandul (KK) line will be short-terminated at Dantewada. This temporary measure aims to ensure passenger safety and improve infrastructure reliability. Passengers are advised to check updated schedules and plan their journeys accordingly.


The Indian Railways has announced a temporary operational change on the Kothavalasa-Kirandul (KK) line, a crucial route traversing the Eastern Ghats and serving both passenger and freight traffic. To undertake essential safety enhancement works, select trains will be short-terminated at Dantewada station. This measure is part of the railways' ongoing commitment to maintaining and upgrading infrastructure to ensure passenger safety and service reliability.

Scope of Safety Works:

The safety works encompass a range of activities aimed at bolstering the structural integrity and operational efficiency of the KK line. Key components of the project include:

  1. Track Maintenance and Upgradation: Comprehensive inspection and reinforcement of tracks to address wear and tear, ensuring they meet safety standards.

  2. Bridge and Tunnel Inspections: Detailed assessments and necessary repairs of bridges and tunnels along the route to enhance structural stability.

  3. Signaling System Enhancements: Upgradation of signaling equipment to modern standards to improve communication and reduce the risk of operational errors.

  4. Slope Stabilization: Implementation of measures to prevent landslides and soil erosion, particularly in areas prone to such incidents.

Impact on Train Operations:

The safety works necessitate modifications to train operations to minimize passenger inconvenience while ensuring safety. The primary changes include:

  • Short-Termination at Dantewada: Select trains will terminate at Dantewada station instead of their usual destinations beyond this point.

  • Alternative Transportation: Arrangements for buses or other modes of transport may be provided to ferry passengers from Dantewada to their intended destinations, depending on feasibility and demand.

  • Schedule Adjustments: Timetables may be revised to accommodate the safety works, and passengers are advised to verify the latest schedules before planning their travel.

Passenger Advisory:

Passengers planning to travel on the KK line during this period are advised to:

  • Stay Informed: Regularly check official Indian Railways communications for updates on train schedules and operational changes.

  • Plan Ahead: Anticipate potential delays or changes in travel plans due to the safety works and arrange accommodations or alternative transport as necessary.

  • Utilize Helplines: Contact railway helplines or visit enquiry counters for real-time information and assistance.


Waltair DRM Conducts Comprehensive Inspection of Visakhapatnam Railway Station Read Previous

Waltair DRM Conducts Comprehensive Inspection of Visakhapatnam Railway Station

Sign up for the Newsletter

Join our newsletter and get updates in your inbox. We won’t spam you and we respect your privacy.